#1 Fill Material is used for backfilling around foundations. A sub soil for the landscaping. $11.50 Cubic Yard (12 yds min. del)
| #2 Fill Dirt is used around foundations and under concrete slabs. Also a base for building berms. $8.50 Cubic Yard (15 yds = free delivery Bend)
|
Premium Soil Blend-Composted 50/50 Mix $22.50 Cubic Yard (15 yds = free delivery Bend)
| Uncomposted Top Soil (12 yd min. del) $12.50 Cubic Yard (15 yds = free delivery Bend)
|
1/8"-0 Concrete Sand - Gray Washed is used under pavers & base for above ground pools. $39.50 Cubic Yard (10 yds = free delivery Bend)
| Bentonite is a clay used for pond liners or as a pond sealer. $47.50 Cubic Yard (15 yds = free delivery Bend)
|
White Pumice Sand (15 yard minimum delivery) $12.50 Cubic Yard
| Berm Material $8.50 Cubic Yard (15 yds = free delivery Bend)
|
The following table will assist you in determining how much material you will need to order:
Square feet of area you need to cover: Divided by appropriate number below equals cubic yards required.
160 for 2" Deep 108 for 3" Deep 80 for 4" Deep 54 for 6" Deep
Having trouble, give us a call and we can help!
|
|
|